The first prototype of the Il-112V aircraft under construction has received engines

Interesting photos of the visit of August 19, 2017 by the Deputy Prime Minister of the Russian Government Dmitry Rogozin of the Voronezh Aircraft Company (VASO) PJSC and the inspection of the first flight prototype of the Il-112B light military transport aircraft under construction there (serial number 00-01). As can be seen from the photographs, both turboprop engines TV7-117CT produced by ODK-Klimov JSC are already installed on the plane. Both engines were delivered to VASO at the beginning of April 2017.
871212_5531ba72fb0f71e2469dc5f2ad27ac08
The first flight prototype of the Il-112V light military transport aircraft (serial number 00-01) in the final assembly shop of the PJSC Voronezh Aircraft Building Company (VASO). Voronezh, 08/19/2017 (c) VKontakte
Nevertheless, according to known data, the first flight of the first IL-112V prototype was postponed at least for the first quarter of 2018, which was primarily due to the decision to pre-flight test the TV7-117CT engine on the IL-76LL flying airplane (registration 76454, serial number 0073469074).Flight tests on the IL-76LL, as reported, should be started in Zhukovsky at the end of August 2017.
871208_209708e3777f91d9864acd156b482fa0
871211_80ab8ffe1e331c3c2b017b0b6a795026


The first flight prototype of the Il-112V light military transport aircraft (serial number 00-01) in the final assembly shop of the PJSC Voronezh Aircraft Building Company (VASO).

Related news

The first prototype of the Il-112V aircraft under construction has received engines image, picture, imagery


The first prototype of the Il-112V aircraft under construction has received engines 63


The first prototype of the Il-112V aircraft under construction has received engines 45


The first prototype of the Il-112V aircraft under construction has received engines 11


The first prototype of the Il-112V aircraft under construction has received engines 44


The first prototype of the Il-112V aircraft under construction has received engines 73


The first prototype of the Il-112V aircraft under construction has received engines 45


The first prototype of the Il-112V aircraft under construction has received engines 45


The first prototype of the Il-112V aircraft under construction has received engines 8


The first prototype of the Il-112V aircraft under construction has received engines 89